Structural Drainage

Waterproofing leak detection using Cavidrain - Sydney Opera House, Australia

Client New South Wales Government
Contractor

Seymour Whyte

Distributor Global Synthetics
Product

Cavidrain Building

Quantity

4,000m2

Benefits
  • Easy to install and space saving solution
  • High flow capacity provided in a 6mm layer to channel away excess water
  • Carbon saving alternative to crushed stone

The Project
Buildings don’t come much more iconic or prestigious than the Sydney Opera House, a UNESCO World Heritage site and an architectural masterpiece. A $9M AUD tender from the Government of New South Wales commissioned the ‘Western Waterproofing and Paving’ project to upgrade the Opera House’s forecourt.

The Challenge
As part of the re-surfacing project works a comprehensive waterproofing solution was required, with infrastructure contractors Seymour Whyte appointed to implement the design. The Sydney Opera House’s cultural significance and importance as one of the leading visitor attractions in Australia meant it was crucial to find a solution that was fast and easy to install, whilst delivering superior drainage.

Our Solution
ABG’s Cavidrain® S6U Std drainage layer, a light-weight and easy to handle 6mm thick preformed cavity drainage system, was specified as the ideal solution to channel away any excess water from the membrane to a subsurface drain. Designed to create a drainage void space on both new and existing below ground structures, Cavidrain offers multiple benefits.

The Cavidrain® S6U Std high-strength core withstands the compressive loads associated with wet concrete placement, and once the concrete is poured, it fills up the cuspated HDPE cavities, making the final load capacity approximately equivalent to that of the concrete slab.

ABG Cavidrain® S6U Std Geocomposite

When compared to using traditional crushed stone layers, Cavidrain offers significantly increased drainage performance and a reduced construction depth. This in turn delivers large carbon savings, with a reduced number of site vehicle movements and fewer associated transport and removal journeys required. The Sydney Opera House Western Waterproofing and Paving project showcases the efficient performance provided by the Cavidrain® S6U Std system, ensuring the creation of an effective drainage void that is easy to handle, quick to install and sustainable.

The ABG Service
ABG assisted with design details and facilitated a tight construction schedule, with a quick manufacturing turnaround and delivery service.

Additional information